Design elements included custom wolf logo at center field. Black and light blue end zone graphics with the words Wolfpack spelled out, and WBA text elements along the sideline. Wilkes-Barre Area School District Design Build The new AstroTurf fields replaced existing natural grass practice fields, to include two full size auxiliary fields complimented by baseball and softball. Lake-Lehman Area School District Design Build Field renovations for Millburn High School, which included removal of the clay infield area, building a new drainage system for the new turf area, removal and replacement of the existing turf area and other general site improvements. Millburn High School Design Build Completed field renovations, which included building a new drainage and stormwater management system, installation of the synthetic turf surface and installation of all new field lighting. Jim Thorpe High School Design Build Re-design of the athletic facility and create plans, permit submittals, and approvals. The project also included constructing a new synthetic turf stadium field and new softball & baseball infields along with a new drainage and stormwater management system. Seneca High School Design Build Scope of work included design, submittals, permit approvals, a new drainage system, a new synthetic turf field and additional site improvements such as ADA access and retaining walls. Hunter Soccer Club Design Build The scope of work on this project included laser grading of the preexisting stone base, as well as the reclamation and recycling of the current infill. J.P. Stevens High School Keystone Sports Construction recently completed renovations to the tennis courts at Slippery Rock University, a public university located in Pennsylvania. Slippery Rock University Tennis The scope of work on this project included the removal of the pre-existing turf and the installation of drainage to connect with the area’s current storm management system. Greene Township The project included the installation of a new acrylic surface that has been striped to accommodate four tennis courts, displaying a brown and green color scheme. Lehigh University Indoor Tennis Keystone Sports Construction recently finished renovations on the Edison High School stadium, track, and turf field. Edison Township High School The project included the installation of a new acrylic surface that has been striped to accommodate two tennis courts, displaying a blue and green color scheme. Brockway Area School District Tennis The scope of work on this project included laser grading of the preexisting stone base, as well as the reclamation and recycling of the current infill. Bishop Eustace Preparatory School Keystone Sports Construction recently completed renovations to the Northern Garrett Middle School, In Garrett County Public Schools. Garrett County Public Schools Tennis Keystone’s renovation project included essential groundwork, new paving, and the placement of new poles and tennis nets. Wilmington Friends School Tennis Keystone Sports Construction recently completed renovations to the pickleball court surfaces at Deacons Walk Park. New Castle County, Deacons Walk Park Keystone Sports Construction recently completed renovations to the pickleball and basketball court surfaces at Laury’s Firehouse Park. North Whitehall Township This project included the installation of a new acrylic surface and striping to accommodate five tennis courts. Exeter Township School District The scope of work on this project included laser grading of the preexisting stone base, as well as the reclamation and recycling of the current infill. Boonton High School Stadium The renovations for this project included essential groundwork, new paving, and new nets and poles. New Castle County, Bonsall Park The scope of work on this project included laser grading of the preexisting stone base, as well as the reclamation and recycling of the current infill. Norristown Area School District Recently completed renovations to the Union City High School’s rooftop field in Union City, NJ. Union City HS Rooftop Field This project included power washing and crack repairs on the existing courts, as well as the installation of a new acrylic surface. Lock Haven University Tennis The scope of work on this project included laser grading of the preexisting stone base, as well as the reclamation and recycling of the current infill. Susquehanna University This reconstruction project included laser grading of the preexisting stone base, as well as the reclamation and recycling of the current infill. The College of Saint Rose Keystone Sports Construction recently completed renovations to the tennis court surfaces at Palmerton Area High School. Palmerton Area High School This project included power washing and crack repairs on the existing courts, as well as the installation of a new acrylic surface. Bloomsburg University The project included power washing and crack repairs to the existing courts, as well as the installation of a new acrylic surface. Northampton County Tennis & Pickleball Recently completed renovations to the tennis and basketball court surfaces at Fox Chase Recreation Center. Fox Chase Recreation Center Renovations to the Caesar Rodney High School tennis courts in Camden Delaware. Caesar Rodney High School Tennis Recently finished renovating seven tennis courts located at Upper Darby High School. Upper Darby High School Tennis Project included building a new stormwater management system, installation of new fencing, installation of a new ballstopper netting system and installation of the premiere synthetic turf system Astroturf 3D3 Blend. Tyrone Area High School The project included power washing and crack repairs to the existing courts, as well as the installation of a new acrylic surface. Bayville Shores The project involved removal of existing turf and installation of Astroturf’s Rhino SF synthetic turf system. Virginia Beach Field House Recently completed renovations to the tennis court area located at East Goshen Township Park. East Goshen Township Park The project involved power washing and crack repair on the existing surface, followed by the installation of a new acrylic surface. Dallas Area School District This project included the construction of two brand new pickleball courts and two new outdoor bocce ball courts. Ted Gacomis Senior Park The procedure involved the installation of a six-inch stone base, followed by the application of a newly laid asphalt surface, ultimately finished with an acrylic top coat. Cattail Creek Country Club Pickleball Recently finished renovating the basketball and soccer surfaces at Fotteral Square Park in the Fairhill neighborhood of historic North Philadelphia. City of Philadelphia Removal and replacement of the synthetic turf field. Oley Valley High School Recently completed the renovation of the pickleball courts at Saint Stanislaus Park in Hazleton, Pennsylvania. Hazleton Township Pickleball The project involved installation of the Astroturf Rhino HR Baseball synthetic turf system at the newly constructed field. Edward O’Malley Athletic Association Tennis court project that was recently completed for West Chester Area School District West Chester Area School District Keystone Sports Construction recently completed renovations to the Germantown Academy stadium synthetic turf field in Fort Washington, PA. Germantown Academy – Brockfill Removal and replacement of the all green synthetic turf field. Newtown Athletic Club Removal and replacement of the existing turf field. Fountain of Life Center Indoor Removal and replacement of the synthetic turf field. Sportsplex at Warminster Recently completed field renovations that included removal and replacement of the synthetic turf field. Henderson High School Auxiliary Field Recycling of the existing infill, removal and replacement of the turf field and a track resurfacing with Rekortan Resurface material. Franklin Township High School Track and Field Conversion of the existing natural grass infield to a new synthetic turf infield. Mercer County Community College Baseball Infield Completed field renovations that involved reclaiming and recycling the existing infill, along with removal and replacement of the existing synthetic turf. Elizabethtown College Reconstruction of the Henderson High School synthetic track. Henderson High School Track Reconstruction Conversion of the existing natural grass field to a new synthetic turf surface, retaining wall construction, paving and fencing installation. Midd-West High School Installation of a new synthetic turf indoor soccer field. Select Soccer of Horsham Field renovations at The Proving Grounds Indoor Facility. The project involved installation of a new synthetic turf indoor field. The Proving Grounds Indoor Field renovations of Fellowship Field for Upper Uwchlan Township. The project involved reclaiming and recycling of the existing infill and removal and replacement of the existing synthetic turf. Upper Uwchlan Township Recently completed field renovations of the Camden Catholic High School Field. The project involved reclaiming and recycling the existing infill and removal and replacement of the existing synthetic turf. Camden Catholic High School Reclaiming and recycling the existing infill, removal and replacement of the synthetic turf with Astroturf Rhino SF. Iroquois High School Recently completed field renovations of the GMercyU Stadium Field. The project involved reclaiming and recycling the existing infill, removal and replacement of the synthetic turf with Astroturf Rhino SF Gwynedd Mercy University Recently completed track and field renovations of the Susquehanna Township High School stadium complex. The project involved resurfacing the track and field events areas along with replacing the synthetic turf with with Astroturf Rhino Blend. Susquehanna Township HS Track and Field The project involved E-Layer repair, reclaiming and recycling the existing infill and removal and replacement of the synthetic turf with Astroturf Rhino Blend. St. Georges Technical HS Removal and replacement of both the stadium and auxiliary synthetic turf fields, installation of a ball stopper netting system and improvements to the drainage system. Avon Grove High School Installation of the premiere Astroturf Rootzone Blend turf system at the newly constructed athletic facility. Totowa Public Schools Reconstruction of the four existing tennis courts, building two new tennis courts, installation of a new fence, installation of a new shade structure. Neumann University Tennis Reconstruction Installation of the premium synthetic turf system, Astroturf Rootzone. St. Lukes is the largest indoor turf center in Lehigh Valley. St. Lukes Sports Rink Construction of a new drainage base and synthetic turf field, new running track and track event areas along with new site amenities like fencing and paving. Midd-West HS Stadium Turf and Track Reclaiming and recycling the existing infill and removal and replacement of the synthetic turf with Astroturf’s premiere stadium system, Rootzone 3D3 Blend. Manville High School The comprehensive stadium rebuild project involved stripping the old track, milling and paving the asphalt, major base remediation. Lincoln University Installation of a new synthetic turf field and installation of a ball stopper netting system. Holy Child School at Rosemont The project included converting two older clay courts into new hardcourts; this involved basework, new paving, new acrylic surfacing, refurbishing the existing fence and installation of new court equipment. Upper Main Line YMCA Tennis Court Construction Reclaiming and recycling the existing infill, E-Layer repair / removal, installation of a new shockpad system and replacement of the synthetic turf with Astroturf Rhino series. Cape Henlopen HS Aux Field Installation of a new all black synthetic turf pitch and a ball stopper netting system. Total Soccer Indoor Reclaiming and recycling the existing infill and replacement of the synthetic turf with Astroturf Rootzone series. Lancaster Mennonite School The project included construction of a new multi-purpose synthetic turf field area at the center of campus, and more! Upper Main Line YMCA Pickleball & Turf Field Project included an application of epoxy concrete primer over the newly installed concrete base and installation of new acrylic surfacing and striping for pickleball. Concord Township Pickleball Renovations to the Morristown Beard School softball field in Morristown NJ Morristown Beard School The project included supply and installation of a new acrylic surface striped for tennis. Cab Calloway School Tennis The project included supply and installation of a new acrylic surface striped for tennis. Welsh Valley Middle School Tennis Construction of the new stadium field at VFMC in Wayne PA Valley Forge Military College Track and Field Installation of a new synthetic turf indoor soccer field. Palumbo Soccer Academy Removal of the existing synthetic turf field and replacement with Astroturf Rhino series. Union City High School Removal and replacement of the shockpad underlayment system along with the removal and replacement of the synthetic turf field with Astroturf RootZone 3D3. Stockton University Recently completed renovations to Bridgewater-Raritan’s auxiliary field in Bridgewater, NJ. Bridgewater-Raritan High School removal of the existing synthetic turf field and replacement with Astroturf Rhino series along with resurfacing of the existing running track and the addition of new purple exchange zones. Phoenixville High School Track and Field Resurfacing and restriping of the township Pickleball, Tennis and Basketball courts. Denville Township Surfacing Reclaiming and recycling the existing infill and replacement of the synthetic turf with Astroturf Rhino series. Paul VI High School Renovations to the Pequannock Township athletic complex in New Jersey, with upgrades to the stadium field, auxiliary field and tennis courts. Pequannock Township Stadium Field The project involved renovations to the running track, D zones and event areas. Gallaudet University Running Track Reconstruction and grading of the base, the installation of additional drainage, full depth milling and paving with new asphalt, new nets, posts and fence & a new acrylic surface color coating. North Hills HS Tennis Reconstruction Crack repairs and resurfacing of the existing tennis courts with new acrylic color coat. Penn State Behrend Tennis Recently completed renovations that included installation of a new synthetic turf field lined for soccer. Chester County Sports Arena The project included crack repairs and resurfacing of the existing tennis courts with new acrylic color coat. McDaniel College Tennis The project involved recycling the existing infill, removal of the existing synthetic turf field and replacement with Astroturf Rhino series. New Castle ASD Track and Field The renovation project encompassed essential groundwork, new paving, the installation of upgraded fencing, and new court equipment. Flourtown Swim Club Tennis Keystone Sports Construction recently completed running track upgrades for Keystone Central SD at the Middle School athletic complex in Mill Hall, PA. Keystone Central SD Running Track Reconstruction This project involved reclaiming and recycling the existing infill, removal and replacement of the existing turf surface with Astroturf Rhino series as well as miscellaneous site work such as demolition of the permanent benches. Salvation Army Kroc Center Keystone Sports Construction recently finished upgrades to the Pequannock Township athletic complex Pequannock Township Aux Field & Tennis This project included installation of the premium synthetic turf system, Astroturf RootZone. This is the first of many facilities the club plans on opening. FC Copa Academy Indoor This project included installation of the premium synthetic turf system, Astroturf Rootzone. St. Lukes remains the largest indoor turf center in Lehigh Valley. St. Lukes Fieldhouse Keystone Sports Construction recently finished reconstruction of the playground at West Snyder Elementary School for Midd-West SD in Middleburg, PA. West Snyder Elementary Playground Reconstruction The project involved various site work items to facilitate the construction of a new 1,500 seat aluminum grandstand system. Midd-West HS Grandstands Recently completed installation of a synthetic turf field and ball stopper netting system for the newly opened Selinsgrove Soccer indoor facility in Selinsgrove PA. Selinsgrove Soccer Indoor This project involved recycling the existing infill and removal and replacement of the existing synthetic turf surface with the premium Astroturf RootZone system. Penn Manor High School Renovations to the Keystone Central School District Stadium Field. Central Mountain High School Removal and replacement of the synthetic turf field, removal and replacement of the damaged drainage piping system and stormwater management repairs. Penn Fusion Soccer Academy Demolition of the existing tennis courts, construction of a new asphalt base and color coating of the new tennis courts Rustin High School Tennis Courts The project included removal and replacement of the synthetic turf field with Astroturf RootZone 3D3 along with installation of a new shockpad system. Georgetown University Renovations to the Neumann University stadium field that included removal and replacement of the existing turf field and addition of a new center field logo. Neumann University Recently completed field renovations that involved reclaiming and recycling the existing infill, then removal and replacement of the existing turf field. Cape Henlopen High School Discover the Keystone Difference. Contact Us For More Information. Contact Us Choose Your Sport Whether the objective is home runs, touchdowns, goals or finishes, Keystone can customize a turf solution for any sport. Football Soccer Baseball Lacrosse Field Hockey Multi-Use Indoor