West Chester Area School District Rustin High School Tennis Court Reconstruction | West Chester, PA

West Chester Area School District Rustin High School Tennis Court Reconstruction | West Chester, PA
Location: West Chester, PA
Client: West Chester Area School District
Facility: Rustin High School Tennis Courts
Project Type: Tennis Court Reconstruction
Sports: Tennis
Surface: Asphalt and Acrylic Court Surfacing
Scope: Existing Court Demolition, New Asphalt Base Construction, Color Coating
Project Gallery
Project Summary
Keystone Sports Construction recently completed tennis court reconstruction at Rustin High School in West Chester, Pennsylvania.
The Client
Bayard Rustin High School opened in September 2006. The school honors West Chester native Bayard Rustin, a graduate of the district’s predecessor high school and an organizer of the 1963 March on Washington.
The Challenge
The Rustin project required demolition of the existing courts and construction of a new asphalt base. The scope renewed the court construction beneath the color coating, extending the renovation beyond the surface finish.
Construction Process
The project included demolition of the existing tennis courts, construction of a new asphalt base, and color coating of the new tennis courts.
Project Details
- Demolition of the existing tennis courts
- Construction of a new asphalt base
- Color coating of the new tennis courts
Materials & Systems
- Asphalt base
- Acrylic court color coating
Design Elements
- Line striping for tennis
FAQs
Why is the base so important in new court construction? A court’s finish depends on the construction supporting it. Movement or uneven settlement beneath the pavement can affect the playing surface even when the acrylic coating is new. Base planning therefore considers the ground, material selection, compaction, and drainage before the final layers are installed. This early work creates the foundation for the renovation and helps distinguish a durable construction solution from a surface treatment that leaves deeper problems unresolved.
Why does a newly paved court still need acrylic surfacing? The paved base and the acrylic finish have separate jobs in a court system. Pavement establishes the supporting platform; coatings create the colored playing surface on top of it. Proper preparation between those stages matters because the finish must be applied to suitable pavement. Once the coating system is in place, sports markings establish the layout. A completed paving operation is therefore a construction milestone rather than the end of court installation.