Butler Area School District Historic Pullman Park Baseball Turf Replacement | Butler, PA
Butler Area School District Historic Pullman Park Baseball Turf Replacement | Butler, PA
Location: Butler, PA
Client: Butler Area School District
Facility: Historic Pullman Park Baseball Field
Project Type: Synthetic Turf Replacement
Sports: Baseball
Surface: Synthetic Turf
Scope: Existing Turf Removal, Synthetic Turf Installation
Turf System: Shaw Sports Turf Momentum Pro
Project Gallery



Project Summary
Keystone Sports Construction recently completed synthetic turf replacement at Historic Pullman Park for the Butler Area School District in Butler, Pennsylvania.
The Client
Historic Pullman Park was built in 1934 and has hosted farm teams affiliated with the New York Yankees, Detroit Tigers, Cleveland Indians, and Pittsburgh Pirates.
The Challenge
The renovation required removing the existing turf before installing a new baseball playing surface.
Construction Process
The project was initiated with the removal of the existing turf. Keystone then installed Shaw Sports Turf’s Momentum Pro turf system for the field.
Project Details
- Removal of existing turf.
- Momentum Pro turf installation.
Materials & Systems
- Shaw Sports Turf Momentum Pro.
Design Elements
- Baseball lines.
FAQs
What happens before replacement turf is installed? A turf replacement starts with a plan for the new system, field design, and removal of the existing materials. After the old turf is removed, the exposed base is evaluated and prepared for installation. Some fields need localized repairs or grading, while others require more extensive foundation work. Addressing those conditions before the new turf is laid helps avoid covering up problems that could affect the replacement field.
Why does ball response matter when choosing baseball turf? Baseball turf needs to support predictable ball movement, including the bounce, roll, spin, and hop of a ground ball. The infield, outfield, and other playing areas place different demands on the surface, so material selection should consider how those areas function together. Keystone evaluates turf construction and system configuration around these requirements. Planning for ball response alongside player movement helps create a surface suited to baseball’s specific patterns of play.