Lake-Lehman Area School District Design Build
Keystone Sports Construction recently designed and built a new synthetic turf complex for Lake-Lehman Area School District. The new AstroTurf fields replaced existing natural grass practice fields, to include two full size auxiliary fields complimented by baseball and softball. Musco lighting and state of the art sound system was also installed. Required earthwork enabled two additional natural grass soccer fields to be built adjacent to the turf complex.