Lake-Lehman Area School District Design Build

Keystone Sports Construction recently designed and built a new synthetic turf complex for Lake-Lehman Area School District. The new AstroTurf fields replaced existing natural grass practice fields, to include two full size auxiliary fields complimented by baseball and softball.  Musco lighting and state of the art sound system was also installed. Required earthwork enabled two additional natural grass soccer fields to be built adjacent to the turf complex.

Lake-Lehman School District

Interested in getting your own project started?

Keystone Sports Construction has been recognized as one of the Fastest growing companies in the Country by Inc Magazine

Designed By: SEO Locale